Muscat: The Ministry of Transport, communications and IT has fully opened the Suwaiq-Al Hoqain dual carriageway project.

The Ministry said in a statement: "The Ministry of Transport, Communications, and IT opens Suwaiq-AlHuqain dual carriageway project fully for traffic which is 20km in total. This will fully utilise the strategic Batinah Expressway by establishing upgraded road links between Al-Batinah expressway with the Al-Batinah dual carriageway and construct new interchanges to keep up with the growing traffic between North and South Al-Batinah Governorates."

The project features a dual carriageway with two 3.75m wide lanes in each side, 2.5m wide external asphalt road shoulders and 1.5m wide internal asphalt road shoulders.

© Muscat Media Group Provided by SyndiGate Media Inc. (Syndigate.info).

Disclaimer: The content of this article is syndicated or provided to this website from an external third party provider. We are not responsible for, and do not control, such external websites, entities, applications or media publishers. The body of the text is provided on an “as is” and “as available” basis and has not been edited in any way. Neither we nor our affiliates guarantee the accuracy of or endorse the views or opinions expressed in this article. Read our full disclaimer policy here.