PHOTO
Dubai, United Arab Emirates: Yellow Door Energy, a UAE-based sustainable energy provider for businesses, has successfully commissioned a 2 megawatt-peak (MWp) solar plant for Future Pipe Industries (FPI). Located in Dubai Industrial City, the solar plant is expected to generate 3,200 megawatt-hours of clean energy in its first year of operation, equivalent to reducing 1,300 tonnes of carbon emissions per year.
Completed in time to celebrate the Dubai Solar Show and WETEX, this massive solar plant covers the rooftops of four warehouses totalling 18,000 square meters and comprises of more than 6,000 solar panels. It will meet 40% of the factory’s energy consumption needs and help FPI significantly reduce electricity costs.
Dirk Matthys, Chief Operating Officer at Future Pipe Industries, said: “Sustainability is intrinsic to the way we do business at Future Pipe Industries. The solar project with Yellow Door Energy at our DIC facility enables us to reduce our energy costs and lower our carbon footprint, all without any upfront investment. We look forward to having this solar plant generate clean energy for us for many years to come.”
Saud Abu Al-Shawareb, Managing Director at Dubai Industrial City, said: “As a leading regional industrial and logistics hub, we prioritise sustainable practices and continue to work closely with our partners from design to completion to ensure their operations are eco-friendly and efficient. The completion of Future Pipe Industries’ solar plant is a milestone for our community and a testament to the UAE’s role as a global platform for innovative companies at the heart of the clean energy movement. We are proud of our business partner’s commitment to sustainability which now means more than 14 megawatts of clean electricity is generated on site at Dubai Industrial City. We hope this will encourage others to explore renewable power with Dubai’s logistics and manufacturing sector poised to play a prominent role in the region’s economic resilience.”
Jeremy Crane, CEO and Co-Founder of Yellow Door Energy, said: “We are proud to support Future Pipe Industries’ sustainability endeavor through the development of this solar plant. We hope businesses in Dubai Industrial City will soon recover from the pandemic and consider solar projects to reduce electricity costs. As a Dubai-based solar developer, Yellow Door Energy is honored to contribute to DEWA’s Shams Dubai Program and the UAE Energy Strategy 2050.”
As the solar developer, Yellow Door Energy is responsible for investing in, designing, building, commissioning, operating and maintaining the solar plant for the duration of the contract. Contracting with solar developers is gaining popularity among industrial building owners who want to reduce energy costs without any upfront investment or operational risk, while maintaining focus on their core business and enjoying the benefits of clean energy.
© Press Release 2020
Disclaimer: The contents of this press release was provided from an external third party provider. This website is not responsible for, and does not control, such external content. This content is provided on an “as is” and “as available” basis and has not been edited in any way. Neither this website nor our affiliates guarantee the accuracy of or endorse the views or opinions expressed in this press release.
The press release is provided for informational purposes only. The content does not provide tax, legal or investment advice or opinion regarding the suitability, value or profitability of any particular security, portfolio or investment strategy. Neither this website nor our affiliates shall be liable for any errors or inaccuracies in the content, or for any actions taken by you in reliance thereon. You expressly agree that your use of the information within this article is at your sole risk.
To the fullest extent permitted by applicable law, this website, its parent company, its subsidiaries, its affiliates and the respective shareholders, directors, officers, employees, agents, advertisers, content providers and licensors will not be liable (jointly or severally) to you for any direct, indirect, consequential, special, incidental, punitive or exemplary damages, including without limitation, lost profits, lost savings and lost revenues, whether in negligence, tort, contract or any other theory of liability, even if the parties have been advised of the possibility or could have foreseen any such damages.