PHOTO
- 8 MWp capacity designed to meet the building’s net zero targets
Dubai, United Arab Emirates: ALEC Energy has won the contract to provide a solar photovoltaic solution for Dubai Electricity and Water Authority’s (DEWA’s) new headquarters, Al-Shera’a (Arabic for sail), in the Al Jaddaf area of Dubai.
In order to maximise the solution’s full potential, ALEC Energy provided a multi-tiered solution which includes the delivery of almost 21,150m2 of building attached photovoltaic (BAPV) panels on the roof, more than 1,000m2 of building integrated photovoltaic (BIPV) panels in the façade and almost 2,000m2 of podium fins as well as fibre optic collectors, shaded structure PV and solar trees, which collectively will generate 4.8 MWp upon completion, helping to ensure the new headquarters will reach its net zero targets.
Working alongside other stakeholders including main contractor, Ghantoot Transport & General Contracting LLC and consultant, ATKINS, ALEC Energy are designing customised, walkable solar panels with a high transparency feature that matches the striking architectural design of the building.
HE Saeed Mohammed Al Tayer, MD and CEO of DEWA, said, “We work in line with the vision and directives of His Highness Sheikh Mohammed bin Rashid Al Maktoum, Vice President and Prime Minister of the UAE and Ruler of Dubai, to make Dubai a global hub for clean energy and green economy. DEWA contributes to accelerating the shift towards Net Zero Energy Buildings and establishing a sustainable energy model that supports economic growth, without damaging the environment and its resources. By building Al-Shera’a, DEWA’s new headquarters, which will be the tallest, largest, and smartest government Zero Energy building in the world, we establish a global benchmark for buildings that achieve a balance between development and the environment, to protect the right of future generations to live in a clean, healthy and safe environment.”
Speaking on behalf of ALEC Energy, James Stewart, general manager said, “Winning this project has been a great endorsement of ALEC Energy’s ability to provide the most innovative, cost-effective solution that not only meets, but exceeds the ambitious targets set by DEWA for the building. In delivering a solution that illustrates DEWA’s commitment to utilising clean energy, we are also supporting the UAE Government’s high-level targets of clean energy supply within the next thirty years.”
“The most energy efficient solar cells currently available worldwide are used for this project. Accredited laboratories will conduct numerous sophisticated performance tests, quality controls and rigorous durability tests prior to the manufacturing of the the PV panels. This project and the integrated solar design truly pushes the boundaries of solar power further,” Stewart remarked.
Al-Sheraa’s built-up area is over 2 million square feet. The building will have 15 floors, a basement and 5 floors of car parking. The building can house 5,000 people. Total energy used in the building during a year will be equal to or less than the energy produced onsite in a year. DEWA’s new headquarters has been designed to receive a platinum rating by LEED (Leadership in Energy and Environmental Design) and a gold rating from the WELL Building Standard.
About ALEC Energy:
ALEC Energy (est. 2015) is a related business division of ALEC Engineering and Contracting L.L.C. and offers a complete turnkey solution for both rooftop and ground mounted solar PV plants. In a country where solar is the natural solution for clean power, ALEC Energy has established itself as a reliable provider that combines technical know-how and experience to deliver a cost-effective solution for its clients. ALEC Energy offers a complete spectrum of services from concept to commissioning and operations to maintenance across the UAE. For more information, please visit: alecenergy.ae
© Press Release 2021
Disclaimer: The contents of this press release was provided from an external third party provider. This website is not responsible for, and does not control, such external content. This content is provided on an “as is” and “as available” basis and has not been edited in any way. Neither this website nor our affiliates guarantee the accuracy of or endorse the views or opinions expressed in this press release.
The press release is provided for informational purposes only. The content does not provide tax, legal or investment advice or opinion regarding the suitability, value or profitability of any particular security, portfolio or investment strategy. Neither this website nor our affiliates shall be liable for any errors or inaccuracies in the content, or for any actions taken by you in reliance thereon. You expressly agree that your use of the information within this article is at your sole risk.
To the fullest extent permitted by applicable law, this website, its parent company, its subsidiaries, its affiliates and the respective shareholders, directors, officers, employees, agents, advertisers, content providers and licensors will not be liable (jointly or severally) to you for any direct, indirect, consequential, special, incidental, punitive or exemplary damages, including without limitation, lost profits, lost savings and lost revenues, whether in negligence, tort, contract or any other theory of liability, even if the parties have been advised of the possibility or could have foreseen any such damages.