Cairo: - The Arab Consulting Engineers Company (ACE Moharram-Bakhoum), the leading a multidisciplinary engineering consulting company, is partaking in the project of modernize signaling and communication systems on the 118km Nag Hammadi - Luxor railway track at a total cost of USD 110 mn.

Moharram-Bakhoum will be designing and supervising the implementation of control stations, civil works, telecommunications networks, and electricity works, while also providing technical support to select the best technical and financial offers for the implementation of the project.

Eng. Ahmed Moharram, Group Executive Director of Moharram-Bakhoum, and President of Anchorage Investments, said: “Moharram-Bakhoum is proud to be mobilizing its distinguished capabilities and engineering competencies to develop this major project. The development of Nag Hammadi – Luxor railway track is amongst the most important national projects undertaken by the Egyptian government and the state’s political leadership to provide safe and easy mass transportation for all citizens.” He added: “The scope of the project is to establish an advanced Centralized Traffic Control (CTC) System to supervise the operation of all trains transiting the track aided by 14 Electrical Infrastructure Services (EIS), and 45 crossings. It is part of a bigger project embarked upon by the Egyptian National Railways to modernize all national railway signaling systems and replace the current old mechanical system with modern electronic tools. Once fully delivered, the project will raise the capacity of the railway from 56 trains/day to 200 trains/day and increase the design speed to 160 km/h throughout the Alexandria - High Dam railway line.” Eng. Moharram pointed out that the project to modernize signaling and communication systems on the Nag Hammadi - Luxor line has been awarded by the Egyptian National Railways and the Hyundai Rotem-Daea consortium of South Korea under the supervision of a consortium consisting of Korean National Railways (KNR), Asia Railway Technology Co., Ltd. (ARTECH), and Moharram-Bakhoum. This modern electronic system will achieve the highest safety standards in the world and certified Safety Integrity Level (SIL4).

The Egyptian National Railways is raising the efficiency of the railways network by renewing several parts of the national network to achieve the highest levels of safety and security by providing close surveillance on the trains throughout the network. In addition, crossings are being upgraded and equipped with automatic gates, warning bells, and lights. This would reduce accidents and achieve safety for vehicles, while also enabling train engineers to contact the operations room easily from any semaphore in cases of emergency.

-Ends-

Send us your press releases to pressrelease.zawya@refinitiv.com


© Press Release 2021

Disclaimer: The contents of this press release was provided from an external third party provider. This website is not responsible for, and does not control, such external content. This content is provided on an “as is” and “as available” basis and has not been edited in any way. Neither this website nor our affiliates guarantee the accuracy of or endorse the views or opinions expressed in this press release.

The press release is provided for informational purposes only. The content does not provide tax, legal or investment advice or opinion regarding the suitability, value or profitability of any particular security, portfolio or investment strategy. Neither this website nor our affiliates shall be liable for any errors or inaccuracies in the content, or for any actions taken by you in reliance thereon. You expressly agree that your use of the information within this article is at your sole risk.

To the fullest extent permitted by applicable law, this website, its parent company, its subsidiaries, its affiliates and the respective shareholders, directors, officers, employees, agents, advertisers, content providers and licensors will not be liable (jointly or severally) to you for any direct, indirect, consequential, special, incidental, punitive or exemplary damages, including without limitation, lost profits, lost savings and lost revenues, whether in negligence, tort, contract or any other theory of liability, even if the parties have been advised of the possibility or could have foreseen any such damages.